Project Overview
Glory Track supplied an A45 marine crane rail system for a ship deck crane rail replacement project in Pakistan.
The project was carried out by a Pakistani engineering service company responsible for both supply and installation. The supplied rails were installed on the ship deck to support the longitudinal movement of a deck crane used for cargo loading and unloading operations.
To meet the requirements of the marine working environment, the A45 rails were treated with surface preparation and multi-layer coating protection before shipment.
Project Information
| Item | Details |
|---|---|
| Project Location | Pakistan |
| Customer Type | Engineering Service Company |
| Application | Ship Deck Crane |
| Project Type | Crane Rail Replacement |
| Rail Type | A45 Rail |
| Supplied Length | 312 m |
| Installation | Completed by Customer |
| Shipment Route | Tianjin Port, China to Karachi Port, Pakistan |
| Delivery Time | Early February 2026 |
Supplied Marine Crane Rail System
For this project, Glory Track supplied a complete marine crane rail system, including:
- A45 crane rails
- Welded rail clamps
- Rubber pads
The A45 rails were designed for the deck crane’s longitudinal travel system, providing a stable running surface for cargo handling operations.
The matching fastening components were supplied together with the rails to ensure compatibility and simplify installation.
Rail Corrosion Protection for Marine Environment
Since the rails would be installed on a ship deck and exposed to a marine environment, corrosion protection was an important requirement.
To improve durability, the A45 rails were processed with:
- SA2.5 sandblasting
- Three-layer painting protection
The surface treatment helps protect the rails against corrosion caused by moisture and salt exposure during long-term operation.


Replacement of Existing Ship Deck Crane Rails
Before the replacement project, the vessel was equipped with existing deck crane rails that had been used for cargo handling operations.
After long-term service, the old rails required replacement to maintain reliable crane movement and operational safety.


Installation Application: Deck Crane Cargo Handling
The supplied marine crane rail system is used for a deck-mounted crane that travels longitudinally along the ship deck.
During operation, the crane moves along the rail track to perform cargo loading and unloading tasks.
The rail system needs to withstand:
- repeated crane movement
- heavy working loads
- marine environmental exposure
A properly selected rail profile and fastening system help ensure stable crane operation.
Why Choose Glory Track
Complete Crane Rail Supply
Glory Track provides complete rail solutions, including:
- crane rails
- rail clamps
- rubber pads
- customized surface treatment
Customers can source compatible components from one supplier, reducing coordination during project execution.
Experience in Crane Rail Replacement Projects
From industrial plants to port and marine applications, Glory Track supports customers with crane rail solutions for different operating environments.
The company provides assistance from rail selection and processing to final delivery.
Project Result
Glory Track successfully supplied 312 meters of A45 marine crane rail system for a ship deck crane replacement project in Pakistan.
With customized corrosion protection and matching fastening components, the supplied rail system provides a reliable foundation for future cargo handling operations.
